[ { "index": 0, "page_number": 0, "bbox": [ 66.6, 663.7302, 528.4579178500001, 685.6802 ], "text": "三峡左岸及地下电站地坪整治(项目名称)招标" }, { "index": 1, "page_number": 0, "bbox": [ 501.0, 735.9942000000001, 532.90939455, 751.9442 ], "text": "正本" }, { "index": 2, "page_number": 0, "bbox": [ 225.6, 519.147, 369.6, 555.147 ], "text": "投标文件" }, { "index": 0, "page_number": 1, "bbox": [ 53.64, 606.4522999999999, 86.8778761, 616.9023 ], "text": "2.2.4(1)" }, { "index": 1, "page_number": 1, "bbox": [ 53.64, 283.2933, 86.8778761, 293.7433 ], "text": "2.2.4(2)" }, { "index": 0, "page_number": 2, "bbox": [ 53.64, 607.4123, 86.8778761, 617.8623 ], "text": "2.2.4(3)" }, { "index": 0, "page_number": 3, "bbox": [ 270.6, 748.058, 324.6, 766.058 ], "text": "目 录" }, { "index": 1, "page_number": 3, "bbox": [ 89.4, 708.1220000000001, 221.4, 720.1220000000001 ], "text": "一、投标函及投标函附录" }, { "index": 2, "page_number": 3, "bbox": [ 89.4, 676.922, 173.4, 688.922 ], "text": "二、合规承诺函" }, { "index": 3, "page_number": 3, "bbox": [ 89.4, 645.842, 293.4, 657.842 ], "text": "三、授权委托书、法定代表人身份证明" }, { "index": 4, "page_number": 3, "bbox": [ 89.4, 614.763, 245.4, 626.763 ], "text": "四、联合体协议书(不适用)" }, { "index": 5, "page_number": 3, "bbox": [ 89.4, 583.563, 173.4, 595.563 ], "text": "五、投标保证金" }, { "index": 6, "page_number": 3, "bbox": [ 89.4, 552.482, 209.4, 564.482 ], "text": "六、已标价工程量清单" }, { "index": 7, "page_number": 3, "bbox": [ 89.4, 521.2819999999999, 185.4, 533.2819999999999 ], "text": "七、施工组织设计" }, { "index": 8, "page_number": 3, "bbox": [ 89.4, 490.2019999999999, 185.4, 502.2019999999999 ], "text": "八、项目管理机构" }, { "index": 9, "page_number": 3, "bbox": [ 89.4, 459.1219999999999, 269.4, 471.1219999999999 ], "text": "九、拟分包项目情况表(不适用)" }, { "index": 10, "page_number": 3, "bbox": [ 89.4, 427.9219999999999, 185.4, 439.9219999999999 ], "text": "十、资格审查资料" }, { "index": 11, "page_number": 3, "bbox": [ 89.4, 396.8419999999999, 341.4, 408.8419999999999 ], "text": "十一、投标关键技术、部件、设备及材料来源表" }, { "index": 12, "page_number": 3, "bbox": [ 89.4, 365.7629999999999, 257.4, 377.7629999999999 ], "text": "十二、构成投标文件的其他材料" }, { "index": 0, "page_number": 4, "bbox": [ 220.32, 750.7868, 374.8880964, 764.8367999999999 ], "text": "一、投标函及投标函附录" }, { "index": 1, "page_number": 4, "bbox": [ 255.48, 720.5468, 339.8488169, 734.5967999999999 ], "text": "(一)投标函" }, { "index": 2, "page_number": 4, "bbox": [ 78.0, 275.40299999999996, 372.0, 287.40299999999996 ], "text": "9. 法定代理人或其委托代理人的联系方式及电子邮箱:" }, { "index": 0, "page_number": 5, "bbox": [ 241.44, 753.7868, 353.8885287, 767.8367999999999 ], "text": "(二)投标函附录" }, { "index": 1, "page_number": 5, "bbox": [ 291.84, 664.6651999999999, 328.6228714, 675.1152 ], "text": "1.1.2.4" }, { "index": 2, "page_number": 5, "bbox": [ 291.84, 606.5862, 328.6228714, 617.0362 ], "text": "1.1.4.3" }, { "index": 3, "page_number": 5, "bbox": [ 291.84, 577.6651999999999, 328.6228714, 588.1152 ], "text": "1.1.4.5" }, { "index": 4, "page_number": 5, "bbox": [ 302.28, 548.8652, 318.0643906, 559.3152 ], "text": "4.2" }, { "index": 5, "page_number": 5, "bbox": [ 299.64, 519.9452, 320.7040859, 530.3952 ], "text": "13.1" }, { "index": 6, "page_number": 5, "bbox": [ 294.359, 491.1452, 325.8621761, 501.5952 ], "text": "17.4.1" }, { "index": 0, "page_number": 6, "bbox": [ 248.4, 753.7868, 346.8086728, 767.8367999999999 ], "text": "二、合规承诺函" }, { "index": 1, "page_number": 6, "bbox": [ 77.99999999999997, 628.5630000000001, 541.3199999999999, 640.5630000000001 ], "text": "一、投标人及其关联人严格遵守所有适用的法律法规、行业管理规范及业务监管要求,未" }, { "index": 2, "page_number": 6, "bbox": [ 78.0, 581.8820000000001, 541.3199999999999, 593.8820000000001 ], "text": "二、投标人及其关联人均未以影响商业决策或获取不正当利益为目的,直接或间接向任何" }, { "index": 3, "page_number": 6, "bbox": [ 78.0, 535.202, 541.32, 547.2020000000001 ], "text": "三、投标人及其业务合作伙伴将全面协助和配合中国长江电力股份有限公司(招标人)的" }, { "index": 4, "page_number": 6, "bbox": [ 78.00000000000006, 488.522, 426.00000000000006, 500.522 ], "text": "四、投标人所提供的任何声明、信息和业务陈述都是准确真实的;" }, { "index": 5, "page_number": 6, "bbox": [ 78.00000000000006, 465.122, 541.32, 477.122 ], "text": "五、投标人违反以上承诺,应承担违约责任,包括赔偿中国长江电力股份有限公司(招标" }, { "index": 0, "page_number": 7, "bbox": [ 178.2, 753.7868, 417.12676920000007, 767.8367999999999 ], "text": "三、授权委托书、法定代表人身份证明" }, { "index": 0, "page_number": 9, "bbox": [ 241.44, 753.7868, 353.8885287, 767.8367999999999 ], "text": "四、联合体协议书" }, { "index": 0, "page_number": 10, "bbox": [ 248.4, 750.7868, 346.8086728, 764.8367999999999 ], "text": "五、投标保证金" }, { "index": 0, "page_number": 11, "bbox": [ 75.959, 326.4187999999999, 541.3249985000001, 337.46879999999993 ], "text": "2.贵司可从我单位保证金中扣除中标服务费用后将余额退给我单位,如不足,接到贵司通知后 5" }, { "index": 1, "page_number": 11, "bbox": [ 75.959, 292.2187999999999, 541.2069513499998, 303.2687999999999 ], "text": "3.扣除中标服务费后的余额或退还的投标保证金及利息请按原汇款路径退回我单位,如我单位账" }, { "index": 2, "page_number": 11, "bbox": [ 75.959, 258.0187999999998, 541.3237498499998, 269.06879999999984 ], "text": "4.若我单位未提供“利息费用(资金占用费)”增值税普通发票,我单位放弃收取投标保证金利" }, { "index": 0, "page_number": 12, "bbox": [ 227.4, 753.7868, 367.9282405, 767.8367999999999 ], "text": "六、已标价工程量清单" }, { "index": 0, "page_number": 13, "bbox": [ 613.44, 425.9372, 638.4541109500001, 435.8872 ], "text": "10.35" }, { "index": 1, "page_number": 13, "bbox": [ 613.44, 375.7772, 638.4541109500001, 385.7272 ], "text": "10.21" }, { "index": 2, "page_number": 13, "bbox": [ 613.44, 325.4972, 638.4541109500001, 335.4472 ], "text": "10.21" }, { "index": 3, "page_number": 13, "bbox": [ 618.48, 236.69819999999999, 638.4542568500001, 246.6482 ], "text": "5.17" }, { "index": 4, "page_number": 13, "bbox": [ 613.44, 126.5372, 638.4541109500001, 136.4872 ], "text": "24.93" }, { "index": 0, "page_number": 14, "bbox": [ 613.44, 145.2582, 638.4541109500001, 155.2082 ], "text": "26.49" }, { "index": 0, "page_number": 35, "bbox": [ 78.0, 753.3380000000001, 245.158176, 768.1220000000001 ], "text": "5.6 安全文明措施费报价明细表" }, { "index": 0, "page_number": 37, "bbox": [ 241.44, 753.7868, 353.8885287, 767.8367999999999 ], "text": "七、施工组织设计" }, { "index": 0, "page_number": 39, "bbox": [ 70.79999999999998, 717.4268, 524.5847222500006, 731.4767999999999 ], "text": "第一章 施工组织设计 .......................................... 40" }, { "index": 1, "page_number": 39, "bbox": [ 70.79999999999998, 681.1868, 524.4641030000005, 695.2367999999999 ], "text": "第二章 无机磨石品牌及质量 ....................................130" }, { "index": 2, "page_number": 39, "bbox": [ 70.79999999999998, 644.8267999999999, 524.4641170500004, 658.8767999999999 ], "text": "第三章 无机磨石地坪的施工工艺及质量控制 ......................165" }, { "index": 3, "page_number": 39, "bbox": [ 70.79999999999998, 608.4677999999999, 524.4641170500001, 622.5177999999999 ], "text": "第四章 投标关键技术、设备、部件及材料的来源及供应可靠性 ...... 173" }, { "index": 4, "page_number": 39, "bbox": [ 70.79999999999998, 572.2267999999999, 524.4641030000005, 586.2767999999999 ], "text": "第五章 施工安全和文明施工 ....................................192" }, { "index": 5, "page_number": 39, "bbox": [ 70.79999999999998, 535.8677999999999, 524.4641030000005, 549.9177999999998 ], "text": "第六章 组织机构及施工管理人员 ................................210" }, { "index": 6, "page_number": 39, "bbox": [ 70.79999999999998, 499.6267999999999, 524.4641030000003, 513.6767999999998 ], "text": "第七章 成品保护和工程保修工作的管理措施和承诺 ................220" }, { "index": 7, "page_number": 39, "bbox": [ 70.79999999999998, 463.2677999999999, 524.4641170500001, 477.31779999999986 ], "text": "第八章 任何可能的紧急情况的处理措施、预案以及抵抗风险 ........ 222" }, { "index": 8, "page_number": 39, "bbox": [ 70.79999999999998, 426.9077999999999, 524.4641170500005, 440.95779999999985 ], "text": "第九章 与发包人的配合 ........................................232" }, { "index": 0, "page_number": 40, "bbox": [ 230.88, 745.3868, 364.44881185, 759.4368 ], "text": "第一章 施工组织设计" }, { "index": 1, "page_number": 40, "bbox": [ 244.92, 717.4268, 350.28956265, 731.4767999999999 ], "text": "第一节 工程概况" }, { "index": 2, "page_number": 40, "bbox": [ 262.44, 689.4678, 332.64942360000003, 703.5178 ], "text": "(一)概述" }, { "index": 3, "page_number": 40, "bbox": [ 81.959, 661.3868, 165.9676592, 675.4368 ], "text": "一、工程概况" }, { "index": 4, "page_number": 40, "bbox": [ 81.959, 269.4678, 166.08926195000004, 283.51779999999997 ], "text": "二、编制依据" }, { "index": 5, "page_number": 40, "bbox": [ 192.24, 185.46779999999995, 403.08839215000006, 199.51779999999997 ], "text": "(二)工程重难点分析及应对措施" }, { "index": 6, "page_number": 40, "bbox": [ 77.04, 157.38679999999997, 245.0471743, 171.43679999999998 ], "text": "一、工期紧,施工作业面大" }, { "index": 0, "page_number": 41, "bbox": [ 77.04, 129.42679999999996, 315.1261436500001, 143.47679999999997 ], "text": "二、资源投入量大,组织策划工作重要" }, { "index": 0, "page_number": 42, "bbox": [ 77.04, 549.4268, 329.0456894000001, 563.4767999999999 ], "text": "三、现场材料、设备的组织运输工作量大" }, { "index": 1, "page_number": 42, "bbox": [ 77.04, 241.38679999999997, 315.1261436500001, 255.43679999999998 ], "text": "三、现场交通疏导及安全对施工的影响" }, { "index": 0, "page_number": 43, "bbox": [ 199.20000000000002, 409.3868, 396.00810070000006, 423.43679999999995 ], "text": "(三)总体施工组织布置及规划" }, { "index": 1, "page_number": 43, "bbox": [ 81.959, 297.4268, 207.96691675, 311.47679999999997 ], "text": "一、施工总平面管理" }, { "index": 0, "page_number": 44, "bbox": [ 81.959, 605.4678, 236.04662855, 619.5178 ], "text": "二、生产管理及生活设施" }, { "index": 1, "page_number": 44, "bbox": [ 81.959, 381.4268, 222.00677265000002, 395.47679999999997 ], "text": "三、施工现场用水方案" }, { "index": 2, "page_number": 44, "bbox": [ 81.959, 157.38679999999997, 222.00677265000002, 171.43679999999998 ], "text": "四、施工现场供电方案" }, { "index": 0, "page_number": 45, "bbox": [ 81.959, 577.3868, 236.04662855, 591.4368 ], "text": "五、停水、停电应急措施" }, { "index": 1, "page_number": 45, "bbox": [ 81.959, 409.3868, 236.04662855, 423.43679999999995 ], "text": "六、场内道路及场地计划" }, { "index": 2, "page_number": 45, "bbox": [ 81.959, 297.4268, 194.047371, 311.47679999999997 ], "text": "七、施工现场计划" }, { "index": 0, "page_number": 46, "bbox": [ 181.68, 381.4268, 413.52780315, 395.47679999999997 ], "text": "第二节 施工设备配置、选型的合理性" }, { "index": 1, "page_number": 46, "bbox": [ 206.28, 353.4678, 388.92824375000004, 367.51779999999997 ], "text": "(一)主要工程材料配置计划" }, { "index": 2, "page_number": 46, "bbox": [ 53.999999999999986, 269.4678, 541.3291113000001, 283.51779999999997 ], "text": "哪家产品,都要坚持两条原则:一是质量合格并有完整的材质证明;二是初步选" }, { "index": 0, "page_number": 47, "bbox": [ 185.159, 157.38679999999997, 410.04781005, 171.43679999999998 ], "text": "(二)主要设备及施工机具配置计划" }, { "index": 0, "page_number": 50, "bbox": [ 220.32, 745.3868, 374.88957164999994, 759.4368 ], "text": "(三)项目资金安排计划" }, { "index": 1, "page_number": 50, "bbox": [ 74.99999999999997, 717.4268, 187.08837099999997, 731.4767999999999 ], "text": "一、项目资金使用" }, { "index": 2, "page_number": 50, "bbox": [ 81.95899999999997, 353.4678, 278.04588609999996, 367.51779999999997 ], "text": "二、工程资金专款专用保证措施" }, { "index": 0, "page_number": 55, "bbox": [ 81.959, 493.3868, 166.08985205, 507.43679999999995 ], "text": "三、奖惩办法" }, { "index": 1, "page_number": 55, "bbox": [ 69.24000000000001, 353.4678, 525.9645723500003, 367.51779999999997 ], "text": "第三节 施工进度、强度分析的合理性,劳动力计划安排是否满足工期需要" }, { "index": 2, "page_number": 55, "bbox": [ 248.4, 325.3868, 346.809572, 339.43679999999995 ], "text": "(一)施工进度" }, { "index": 3, "page_number": 55, "bbox": [ 81.95899999999997, 297.4268, 180.00751509999998, 311.47679999999997 ], "text": "一、总工期目标" }, { "index": 4, "page_number": 55, "bbox": [ 81.95899999999995, 101.46779999999995, 194.04866359999994, 115.51779999999997 ], "text": "二、工期保证体系" }, { "index": 0, "page_number": 58, "bbox": [ 81.959, 409.3868, 208.08836495000003, 423.43679999999995 ], "text": "三、工期的保证措施" }, { "index": 0, "page_number": 60, "bbox": [ 227.4, 269.4678, 367.9282405, 283.51779999999997 ], "text": "(二)劳动力安排计划" }, { "index": 0, "page_number": 61, "bbox": [ 75.0, 521.4678, 489.60500465000024, 535.5178 ], "text": "第四节 项目资金使用、保证与分配、封闭管理及奖惩措施的可行性" }, { "index": 1, "page_number": 61, "bbox": [ 75.0, 493.3868, 187.088371, 507.43679999999995 ], "text": "一、项目资金使用" }, { "index": 2, "page_number": 61, "bbox": [ 81.959, 129.42679999999996, 278.0458861, 143.47679999999997 ], "text": "二、工程资金专款专用保证措施" }, { "index": 0, "page_number": 66, "bbox": [ 81.959, 297.4268, 166.08985205, 311.47679999999997 ], "text": "三、奖惩办法" }, { "index": 0, "page_number": 67, "bbox": [ 75.0, 745.3868, 541.3276771000003, 759.4368 ], "text": "第五节 专业队伍配备,拟投入本项目现有人员数量、工种、资格资质证书情" }, { "index": 0, "page_number": 107, "bbox": [ 172.2, 745.4868, 446.28690825000007, 759.5368 ], "text": "第六节 施工方法、程序、配合环节的合理性" }, { "index": 1, "page_number": 107, "bbox": [ 81.95899999999999, 717.5268, 165.96765919999999, 731.5767999999999 ], "text": "一、场地测量" }, { "index": 2, "page_number": 107, "bbox": [ 81.95899999999999, 493.4868, 278.04588609999996, 507.53679999999997 ], "text": "(一)施工临时措施及设备防护" }, { "index": 3, "page_number": 107, "bbox": [ 81.95899999999999, 241.4868, 306.00528775000004, 255.5368 ], "text": "(二)地砖及砂浆层凿除、基面处理" }, { "index": 0, "page_number": 108, "bbox": [ 81.959, 633.5268, 264.0060302, 647.5767999999999 ], "text": "(三)混凝土找平层浇筑施工" }, { "index": 0, "page_number": 109, "bbox": [ 81.959, 745.4868, 236.04662855, 759.5368 ], "text": "(四)无机磨石地坪施工" }, { "index": 0, "page_number": 110, "bbox": [ 81.959, 297.52680000000004, 264.0060302, 311.5768 ], "text": "(五)结构缝处理及地坪分缝" }, { "index": 0, "page_number": 111, "bbox": [ 81.959, 229.4868, 306.00528775000004, 243.5368 ], "text": "(六)定置管理划线(环氧地坪漆)" }, { "index": 1, "page_number": 111, "bbox": [ 81.959, 117.52679999999998, 264.0060302, 131.5768 ], "text": "(七)成品不锈钢踢脚线制安" }, { "index": 0, "page_number": 112, "bbox": [ 54.0, 210.52679999999998, 541.4335028000003, 224.5768 ], "text": "1.5mm),按尺寸下料及切割阴阳角,磨去毛刺。将下好尺寸的踢脚线上槽倾斜" }, { "index": 0, "page_number": 113, "bbox": [ 81.959, 488.5678, 264.0060302, 502.61779999999993 ], "text": "(八)质量控制点及验收标准" }, { "index": 1, "page_number": 113, "bbox": [ 81.959, 348.5268, 180.0075151, 362.57679999999993 ], "text": "(九)场地测量" }, { "index": 2, "page_number": 113, "bbox": [ 81.959, 236.56779999999995, 215.04866470000002, 250.61779999999996 ], "text": "(十) 施工临时措施" }, { "index": 0, "page_number": 114, "bbox": [ 81.959, 745.4868, 264.0060302, 759.5368 ], "text": "(十一)地面凿除及基面处理" }, { "index": 1, "page_number": 114, "bbox": [ 81.959, 605.5678, 264.0060302, 619.6178 ], "text": "(十二)找平层摊铺抗裂砂浆" }, { "index": 2, "page_number": 114, "bbox": [ 278.4, 436.4868, 299.46409719999997, 450.53679999999997 ], "text": "4.3" }, { "index": 3, "page_number": 114, "bbox": [ 278.4, 407.56780000000003, 299.46409719999997, 421.6178 ], "text": "8.4" }, { "index": 4, "page_number": 114, "bbox": [ 278.4, 378.52680000000004, 306.42349774999997, 392.5768 ], "text": "26.5" }, { "index": 0, "page_number": 115, "bbox": [ 81.959, 745.4868, 207.9676614, 759.5368 ], "text": "3.3.5 无机磨石地坪" }, { "index": 1, "page_number": 115, "bbox": [ 278.4, 660.5268, 299.46409719999997, 674.5767999999999 ], "text": "5.3" }, { "index": 2, "page_number": 115, "bbox": [ 278.4, 602.5678, 306.42349774999997, 616.6178 ], "text": "26.5" }, { "index": 3, "page_number": 115, "bbox": [ 81.95900000000006, 317.56780000000003, 228.96766250000007, 331.6178 ], "text": "(十三) 不锈钢踢脚线" }, { "index": 4, "page_number": 115, "bbox": [ 54.00000000000006, 177.52679999999998, 103.08999750000005, 191.5768 ], "text": "0.5mm。" }, { "index": 0, "page_number": 116, "bbox": [ 81.959, 689.5678, 165.9676592, 703.6178 ], "text": "(十四)验收" }, { "index": 1, "page_number": 116, "bbox": [ 81.959, 269.56780000000003, 222.00677265000002, 283.6178 ], "text": "(十五)售后服务要求" }, { "index": 0, "page_number": 117, "bbox": [ 81.959, 493.4868, 165.9676592, 507.53679999999997 ], "text": "二、拆除工程" }, { "index": 0, "page_number": 118, "bbox": [ 81.959, 129.52679999999998, 222.00677265000002, 143.5768 ], "text": "三、乳胶漆、涂料工程" }, { "index": 1, "page_number": 118, "bbox": [ 89.04, 101.56779999999998, 187.08911925, 115.61779999999999 ], "text": "(一)、材料要求" }, { "index": 0, "page_number": 119, "bbox": [ 81.959, 549.5268, 180.12911785, 563.5767999999999 ], "text": "(二)、施工工艺" }, { "index": 1, "page_number": 119, "bbox": [ 102.959, 129.52679999999998, 541.5698768, 143.5768 ], "text": "F、刷第二、三遍:操作要求同第一遍。涂刷注意均匀,不得露底,表面" }, { "index": 0, "page_number": 120, "bbox": [ 81.959, 717.5268, 194.0486636, 731.5767999999999 ], "text": "(三)、质量标准:" }, { "index": 1, "page_number": 120, "bbox": [ 81.959, 577.4868, 180.12911785, 591.5368 ], "text": "(五)、注意事项" }, { "index": 2, "page_number": 120, "bbox": [ 81.959, 409.4868, 222.1283754, 423.53679999999997 ], "text": "(四)、检验标准和方法" }, { "index": 0, "page_number": 121, "bbox": [ 81.959, 641.3268, 165.9676592, 655.3768 ], "text": "四、细部工程" }, { "index": 1, "page_number": 121, "bbox": [ 81.959, 117.5268, 222.00677265000002, 131.5768 ], "text": "五、无机磨石施工方法" }, { "index": 0, "page_number": 125, "bbox": [ 81.959, 549.5268, 541.4494132, 563.5767999999999 ], "text": "磨光主要控制二点,一是控制好开磨时间;二是掌握好磨光的遍数。如果开" }, { "index": 0, "page_number": 130, "bbox": [ 209.88, 753.8868, 385.56837955, 767.9368 ], "text": "第二章 无机磨石品牌及质量" }, { "index": 0, "page_number": 165, "bbox": [ 160.68, 753.8868, 434.7669082500001, 767.9368 ], "text": "第三章 无机磨石地坪的施工工艺及质量控制" }, { "index": 0, "page_number": 168, "bbox": [ 81.959, 493.4868, 541.4494132, 507.53679999999997 ], "text": "磨光主要控制二点,一是控制好开磨时间;二是掌握好磨光的遍数。如果开" }, { "index": 0, "page_number": 192, "bbox": [ 209.88, 753.8868, 385.56837955, 767.9368 ], "text": "第五章 施工安全和文明施工" }, { "index": 1, "page_number": 192, "bbox": [ 234.48, 712.3678, 381.96766915, 726.4177999999999 ], "text": "第一节 现场的保护措施" }, { "index": 2, "page_number": 192, "bbox": [ 81.95899999999997, 684.2868, 222.48986784999997, 698.3367999999999 ], "text": "一、安全生产管理目标" }, { "index": 3, "page_number": 192, "bbox": [ 78.11999999999998, 544.3678, 218.52857665, 558.4177999999999 ], "text": "二、安全生产管理体系" }, { "index": 0, "page_number": 193, "bbox": [ 81.959, 351.7677999999998, 194.4075287, 365.81779999999975 ], "text": "三、安全交底措施" }, { "index": 0, "page_number": 194, "bbox": [ 81.959, 689.5678, 541.5687820000002, 703.6178 ], "text": "5、各级施工技术人员必须坚持“安全第一、预防为主”的方针,“管生产" }, { "index": 0, "page_number": 195, "bbox": [ 81.959, 605.5678, 250.56695230000003, 619.6178 ], "text": "四、主要设备安全操作规程" }, { "index": 0, "page_number": 197, "bbox": [ 81.959, 353.56780000000003, 222.4872405, 367.6178 ], "text": "五、施工用电管理规定" }, { "index": 0, "page_number": 200, "bbox": [ 81.959, 297.52680000000004, 194.4075287, 311.5768 ], "text": "六、防火管理规定" }, { "index": 0, "page_number": 203, "bbox": [ 81.959, 577.4868, 166.32781690000002, 591.5368 ], "text": "七、消防措施" }, { "index": 0, "page_number": 204, "bbox": [ 81.959, 381.52680000000004, 194.4075287, 395.5768 ], "text": "八、防灾应急措施" }, { "index": 0, "page_number": 210, "bbox": [ 54.0, 557.8078, 180.48838460000002, 571.8578 ], "text": "(一)现场防尘措施" }, { "index": 1, "page_number": 210, "bbox": [ 228.48000000000002, 577.4868, 390.00752505, 591.5368 ], "text": "第二节 现场防尘防震措施" }, { "index": 0, "page_number": 211, "bbox": [ 77.04, 297.52680000000004, 231.60809640000002, 311.5768 ], "text": "(二)防震降噪控制措施" }, { "index": 0, "page_number": 212, "bbox": [ 77.04, 465.52680000000004, 301.9285712000001, 479.5768 ], "text": "(三)创“绿色环保工地”施工措施" }, { "index": 0, "page_number": 213, "bbox": [ 77.04, 297.52680000000004, 217.5682405, 311.5768 ], "text": "(四)电柜机保护措施" }, { "index": 0, "page_number": 214, "bbox": [ 75.0, 661.4868, 236.64824265, 675.5368 ], "text": "1. 漏电情况下电击的防护" }, { "index": 1, "page_number": 214, "bbox": [ 75.0, 409.4868, 152.28956985000002, 423.53679999999997 ], "text": "2. 短路保护" }, { "index": 0, "page_number": 216, "bbox": [ 206.4, 689.5678, 410.04810435, 703.6178 ], "text": "第六章 组织机构及施工管理人员" }, { "index": 1, "page_number": 216, "bbox": [ 210.24, 661.4868, 406.32688609999997, 675.5368 ], "text": "(一)项目机构设置及现场管理" }, { "index": 0, "page_number": 220, "bbox": [ 150.12, 689.5678, 466.32647595000014, 703.6178 ], "text": "第七章 成品保护和工程保修工作的管理措施和承诺" }, { "index": 1, "page_number": 220, "bbox": [ 217.2, 661.4868, 378.3683649, 675.5368 ], "text": "第一节 成品保护管理计划" }, { "index": 2, "page_number": 220, "bbox": [ 217.2, 210.7678, 378.3683649, 224.8178 ], "text": "第二节 质量保修管理计划" }, { "index": 0, "page_number": 222, "bbox": [ 122.04, 697.4868, 494.4054499500003, 711.5368 ], "text": "第八章 任何可能的紧急情况的处理措施、预案以及抵抗风险" }, { "index": 1, "page_number": 222, "bbox": [ 75.0, 669.5268, 159.0086592, 683.5767999999999 ], "text": "一、组织准备" }, { "index": 2, "page_number": 222, "bbox": [ 75.0, 529.4868, 187.088371, 543.5368 ], "text": "二、领导小组职责" }, { "index": 3, "page_number": 222, "bbox": [ 75.0, 193.4868, 257.0470302, 207.5368 ], "text": "三、消防预防方案及处理预案" }, { "index": 0, "page_number": 223, "bbox": [ 75.0, 185.56779999999998, 201.1283674, 199.6178 ], "text": "2.施工现场消防预案" }, { "index": 0, "page_number": 232, "bbox": [ 234.48000000000002, 157.4868, 381.96766915000006, 171.5368 ], "text": "第九章 与发包人的配合" }, { "index": 0, "page_number": 235, "bbox": [ 75.0, 129.52679999999998, 201.00791675, 143.5768 ], "text": "一、总承包计划管理" }, { "index": 0, "page_number": 236, "bbox": [ 75.0, 633.5268, 299.04628775000003, 647.5767999999999 ], "text": "二、交叉施工过程的总分包协调管理" }, { "index": 1, "page_number": 236, "bbox": [ 75.0, 521.5678, 243.0071743, 535.6178 ], "text": "三、总承包的技术质量管理" }, { "index": 2, "page_number": 236, "bbox": [ 75.0, 353.56780000000003, 243.0071743, 367.6178 ], "text": "四、工程施工管理协调配合" }, { "index": 0, "page_number": 237, "bbox": [ 75.0, 661.4868, 299.04628775000003, 675.5368 ], "text": "五、与管道安装的协调配合工作承诺" }, { "index": 1, "page_number": 237, "bbox": [ 75.0, 493.4868, 215.04777265, 507.53679999999997 ], "text": "六、内部工种间的衔接" }, { "index": 2, "page_number": 237, "bbox": [ 75.0, 213.52679999999998, 215.04777265, 227.5768 ], "text": "七、交叉施工流程控制" }, { "index": 0, "page_number": 239, "bbox": [ 390.24, 656.142, 450.359, 668.142 ], "text": "1.5 优良" }, { "index": 1, "page_number": 239, "bbox": [ 390.24, 616.302, 450.359, 628.302 ], "text": "0.8 优良" }, { "index": 2, "page_number": 239, "bbox": [ 387.24, 539.142, 450.359, 551.142 ], "text": "0.35 优良" }, { "index": 3, "page_number": 239, "bbox": [ 387.24, 499.182, 450.359, 511.182 ], "text": "0.55 优良" }, { "index": 4, "page_number": 239, "bbox": [ 387.24, 422.98199999999997, 450.359, 434.98199999999997 ], "text": "0.44 优良" }, { "index": 5, "page_number": 239, "bbox": [ 387.24, 385.782, 450.359, 397.782 ], "text": "0.58 优良" }, { "index": 6, "page_number": 239, "bbox": [ 387.24, 346.90299999999996, 450.359, 358.90299999999996 ], "text": "0.58 优良" }, { "index": 7, "page_number": 239, "bbox": [ 390.24, 308.382, 450.359, 320.382 ], "text": "1.5 优良" }, { "index": 8, "page_number": 239, "bbox": [ 387.24, 271.303, 450.359, 283.303 ], "text": "0.55 优良" }, { "index": 9, "page_number": 239, "bbox": [ 390.24, 233.62199999999999, 450.359, 245.62199999999999 ], "text": "1.2 优良" }, { "index": 10, "page_number": 239, "bbox": [ 390.24, 195.22199999999998, 450.359, 207.22199999999998 ], "text": "1.5 优良" }, { "index": 11, "page_number": 239, "bbox": [ 390.24, 156.10299999999998, 450.359, 168.10299999999998 ], "text": "0.8 优良" }, { "index": 0, "page_number": 240, "bbox": [ 54.0, 756.2220000000001, 306.956352, 768.2220000000001 ], "text": "附表二:拟配备本工程的试验和检测仪器设备表" }, { "index": 0, "page_number": 241, "bbox": [ 54.0, 756.2220000000001, 168.35908799999999, 768.2220000000001 ], "text": "附表三 劳动力计划表" }, { "index": 0, "page_number": 242, "bbox": [ 372.72, 509.522, 468.95954400000005, 521.522 ], "text": "附表四 进度计划" }, { "index": 0, "page_number": 243, "bbox": [ 241.44, 729.6678, 353.8885287, 743.7178 ], "text": "八、项目管理机构" }, { "index": 1, "page_number": 243, "bbox": [ 213.24, 699.4268000000001, 381.84795230000003, 713.4768 ], "text": "(一)项目管理机构组成表" }, { "index": 0, "page_number": 255, "bbox": [ 227.4, 753.7868, 367.9282405, 767.8367999999999 ], "text": "(二)主要人员简历表" }, { "index": 0, "page_number": 319, "bbox": [ 53.99999999999997, 702.1020000000001, 294.0, 717.582 ], "text": "中国长江电力股份有限公司(招标人名称):" }, { "index": 0, "page_number": 320, "bbox": [ 192.359, 753.8868, 403.2060574, 767.9368 ], "text": "九、拟分包项目情况表(不适用)" }, { "index": 0, "page_number": 321, "bbox": [ 241.44, 753.8868, 353.8885287, 767.9368 ], "text": "十、资格审查资料" }, { "index": 1, "page_number": 321, "bbox": [ 220.44, 726.6468, 375.0080964, 740.6967999999999 ], "text": "(一)投标人基本情况表" }, { "index": 0, "page_number": 334, "bbox": [ 227.4, 753.8868, 367.9282405, 767.9368 ], "text": "(二)近年财务状况表" }, { "index": 1, "page_number": 334, "bbox": [ 345.6, 334.0452, 366.66408590000003, 344.4952 ], "text": "1.7%" }, { "index": 2, "page_number": 334, "bbox": [ 456.359, 334.0452, 477.4230859, 344.4952 ], "text": "1.9%" }, { "index": 0, "page_number": 351, "bbox": [ 215.159, 753.8868, 380.22500349999996, 767.9368 ], "text": "(三)近年类似项目业绩 1" }, { "index": 0, "page_number": 677, "bbox": [ 185.28, 753.8868, 438.2466251000001, 767.9368 ], "text": "(四)正在施工的和新承接的项目情况表" }, { "index": 0, "page_number": 678, "bbox": [ 192.359, 753.8868, 403.2060574, 767.9368 ], "text": "(五)近年发生的诉讼和仲裁情况" }, { "index": 1, "page_number": 678, "bbox": [ 54.00000000000006, 253.52620000000022, 541.3261255499999, 263.9762000000002 ], "text": "3.5.5 条规定的期限内本投标人没有发生诉讼及仲裁纠纷,如不实,构成虚假,自愿承担由此引起的法律责" }, { "index": 0, "page_number": 679, "bbox": [ 150.12, 753.8868, 445.20647380000014, 767.9368 ], "text": "十一、投标关键技术、部件、设备及材料来源表" }, { "index": 0, "page_number": 680, "bbox": [ 199.32, 753.8868, 396.0079451, 767.9368 ], "text": "十二、构成投标文件的其他材料" }, { "index": 0, "page_number": 701, "bbox": [ 141.12, 723.942, 454.31543999999997, 735.942 ], "text": "(一)投标人对招标文件及附件条款的确认及响应的承诺书" }, { "index": 0, "page_number": 702, "bbox": [ 201.359, 728.9820000000001, 394.07626400000004, 740.9820000000001 ], "text": "(二)施工工期及违约处罚的承诺书" }, { "index": 0, "page_number": 703, "bbox": [ 189.24, 752.263, 406.076808, 764.263 ], "text": "(三)不更换项目管理班子成员的承诺书" }, { "index": 0, "page_number": 704, "bbox": [ 171.24, 756.2220000000001, 424.196352, 768.2220000000001 ], "text": "(四)项目经理仅担任本工程项目经理的承诺书" }, { "index": 0, "page_number": 705, "bbox": [ 201.359, 756.2220000000001, 394.07626400000004, 768.2220000000001 ], "text": "(五)不存在禁止投标情形的承诺书" }, { "index": 0, "page_number": 706, "bbox": [ 237.48, 749.022, 357.958176, 761.022 ], "text": "(六)企业信誉承诺书" }, { "index": 1, "page_number": 706, "bbox": [ 77.40000000000003, 629.022, 241.43553600000007, 641.022 ], "text": "1.被依法暂停或取消投标资格;" }, { "index": 2, "page_number": 706, "bbox": [ 77.40000000000003, 605.022, 405.2303280000002, 617.022 ], "text": "2.被责令停产停业、暂扣或者吊销许可证、暂扣或者吊销执照;" }, { "index": 3, "page_number": 706, "bbox": [ 77.40000000000003, 581.022, 405.2303280000002, 593.022 ], "text": "3.进入清算程序,或被宣告破产,或其他丧失履约能力的情形;" }, { "index": 4, "page_number": 706, "bbox": [ 77.40000000000003, 557.022, 299.87390400000015, 569.022 ], "text": "4.在最近三年内有发生重大工程质量问题;" }, { "index": 5, "page_number": 706, "bbox": [ 77.40000000000003, 533.022, 545.5190040000001, 545.022 ], "text": "5.在“国家企业信用信息公示系统”( www.gsxt.gov.cn)被列入严重违法失信企业名单;" }, { "index": 6, "page_number": 706, "bbox": [ 77.40000000000003, 509.022, 487.19553600000023, 521.022 ], "text": "6.在“信用中国”网站(www.creditchina.gov.cn)被列入失信被执行人名单;" }, { "index": 7, "page_number": 706, "bbox": [ 77.40000000000003, 485.022, 463.66869600000024, 497.022 ], "text": "7.在近三年内投标人或其法定代表人、拟委任的项目经理有行贿犯罪行为;" }, { "index": 8, "page_number": 706, "bbox": [ 77.40000000000003, 461.022, 510.47479200000015, 473.022 ], "text": "8.存在法律法规或投标人须知前附表第 1.4.3(19)目规定的不得存在的其他情形。" }, { "index": 0, "page_number": 707, "bbox": [ 105.0, 756.2220000000001, 490.434528, 768.2220000000001 ], "text": "(七)投标单位、投标单位法人及项目经理未被列入失信被执行人承诺书" }, { "index": 0, "page_number": 713, "bbox": [ 123.0, 756.2220000000001, 472.31772, 768.2220000000001 ], "text": "(八)投标单位、投标单位法人及项目经理无行贿犯罪记录承诺书" }, { "index": 0, "page_number": 717, "bbox": [ 249.6, 756.2220000000001, 345.839088, 768.2220000000001 ], "text": "(九)工期承诺书" }, { "index": 0, "page_number": 718, "bbox": [ 249.6, 748.182, 345.839088, 760.182 ], "text": "(十)质量承诺书" }, { "index": 0, "page_number": 719, "bbox": [ 207.24, 748.082, 387.95863199999997, 760.082 ], "text": "(十一)安全生产管理目标承诺书" }, { "index": 0, "page_number": 720, "bbox": [ 207.24, 748.082, 387.959544, 760.082 ], "text": "(十二)文明施工管理目标承诺书" }, { "index": 0, "page_number": 721, "bbox": [ 141.0, 756.1220000000001, 454.196352, 768.1220000000001 ], "text": "(十三)项目管理机构主要人员不在本项目相互兼职承诺书" }, { "index": 0, "page_number": 722, "bbox": [ 56.64, 748.922, 538.4399999999999, 760.922 ], "text": "(十四)单位负责人为同一人或者存在控股、管理关系的不同单位只能有一家单位报名的承" }, { "index": 0, "page_number": 723, "bbox": [ 225.359, 748.922, 369.837176, 760.922 ], "text": "(十五)非联合体投标声明" }, { "index": 0, "page_number": 724, "bbox": [ 222.24, 752.163, 390.958176, 764.163 ], "text": "(十六)书面材料真实性保证书" } ]