12345678910111213141516171819202122232425262728293031 |
- {"index":0,"page_number":705,"text":"(五)不存在禁止投标情形的承诺书","因素":"不得存在的情形","相似度":0.5486750603}
- {"index":0,"page_number":55,"text":"三、奖惩办法","因素":"业绩要求","相似度":0.3549992144}
- {"index":0,"page_number":255,"text":"(二)主要人员简历表","因素":"人员要求","相似度":0.5141109228}
- {"index":0,"page_number":351,"text":"(三)近年类似项目业绩 1","因素":"以往同类项目业绩、经验","相似度":0.6570545435}
- {"index":0,"page_number":232,"text":"第九章 与发包人的配合","因素":"价格得分","相似度":0.3587560952}
- {"index":6,"page_number":706,"text":"6.在“信用中国”网站(www.creditchina.gov.cn)被列入失信被执行人名单;","因素":"信用评价","相似度":0.4579818249}
- {"index":0,"page_number":706,"text":"(六)企业信誉承诺书","因素":"信誉要求","相似度":0.5709712505}
- {"index":3,"page_number":114,"text":"8.4","因素":"其他","相似度":0.3379742801}
- {"index":1,"page_number":118,"text":"(一)、材料要求","因素":"其他要求","相似度":0.4477651715}
- {"index":3,"page_number":192,"text":"二、安全生产管理体系","因素":"安全生产许可证","相似度":0.7061559558}
- {"index":3,"page_number":55,"text":"一、总工期目标","因素":"工期","相似度":0.5227609277}
- {"index":3,"page_number":40,"text":"一、工程概况","因素":"工程质量","相似度":0.6530075073}
- {"index":6,"page_number":3,"text":"六、已标价工程量清单","因素":"己标价工程量清单","相似度":0.739189446}
- {"index":2,"page_number":120,"text":"(四)、检验标准和方法","因素":"技术标准和要求","相似度":0.5083931684}
- {"index":1,"page_number":321,"text":"(一)投标人基本情况表","因素":"投标人名称","相似度":0.772038877}
- {"index":5,"page_number":3,"text":"五、投标保证金","因素":"投标保证金","相似度":0.8615003228}
- {"index":11,"page_number":3,"text":"十一、投标关键技术、部件、设备及材料来源表","因素":"投标关键技术、设备、部件及材料的来源及供应可靠性","相似度":0.7936463952}
- {"index":0,"page_number":723,"text":"(十五)非联合体投标声明","因素":"投标报价","相似度":0.52962327}
- {"index":0,"page_number":9,"text":"四、联合体协议书","因素":"投标报价合理性","相似度":0.3283154368}
- {"index":1,"page_number":3,"text":"一、投标函及投标函附录","因素":"投标文件封面、投标函签字盖章","相似度":0.7844030857}
- {"index":2,"page_number":0,"text":"投标文件","因素":"投标文件格式","相似度":0.9003171921}
- {"index":9,"page_number":239,"text":"1.2 优良","因素":"报价唯一","相似度":0.338262856}
- {"index":0,"page_number":192,"text":"第五章 施工安全和文明施工","因素":"施工安全和文明施工","相似度":0.8497256041}
- {"index":0,"page_number":40,"text":"第一章 施工组织设计","因素":"施工组织设计","相似度":0.8328937292}
- {"index":0,"page_number":130,"text":"第二章 无机磨石品牌及质量","因素":"无机磨石品牌及质量","相似度":0.8734935522}
- {"index":0,"page_number":165,"text":"第三章 无机磨石地坪的施工工艺及质量控制","因素":"无机磨石地坪的施工工艺及质量控制","相似度":0.8576892614}
- {"index":0,"page_number":678,"text":"(五)近年发生的诉讼和仲裁情况","因素":"权利义务","相似度":0.3135215342}
- {"index":0,"page_number":216,"text":"第六章 组织机构及施工管理人员","因素":"组织机构及施工管理人员","相似度":0.8044318557}
- {"index":3,"page_number":13,"text":"5.17","因素":"营业执照","相似度":0.2897812426}
- {"index":0,"page_number":334,"text":"(二)近年财务状况表","因素":"财务状况","相似度":0.6810054779}
- {"index":10,"page_number":3,"text":"十、资格审查资料","因素":"资质条件","相似度":0.4772962928}
|